Doors Projecting Steel Pallet Ring Lock Scaffold Ringlock Scaffolding System Hot Sale

Still deciding? Get samples of $ !
Request Sample

Product Description

Overview
Model NO.
Ringlock Scaffolding
Structural Style
Doors Scaffolding
Framework
Combined Scaffolding
Supporting Mode
Projecting Scaffolding
Lapping Form
Cross Ring Scaffolding
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Ringlock
Construction Properties
Building Scaffold
Product Name
Ringlock System Scaffolding
Stand Tube
48*2.5mm
Thickness
2.5mm;3.0mm;3.25mm
Surface Treatment
Galvanized
Application
Hotel, Apartment, Office Building, in Steel Pallet
After-Sale Service
Onsite Inspection
Model Number
RS-0
Grade
Q235/Q345 Pipe
Color
Silver
Standard
En74/BS1139/As1576
Diameter
M48/M60 or as Customer's Demand
Delivery Time
20-50 Days
Certification
SGS/ ISO900
Transport Package
Steel Pallet
HS Code
7308400000
Production Capacity
6000 Ton/Tons Per Month
Product Description
Product Name Heavy duty OD 60 all round galvanzied ring lock scaffolding system for bridge
Diameter 48.3mm
Thickness of the tube 3.25mm
Tube thickness 1.6-4.0mm
Material Q235 for standards, Q235 for other components or as your request
Rosette Q235, 10MM thickness
Surface treatment Hot dipped galvanized
Components Standard, Ledger, Brace, Metal Plank, Ladder, Base jack, Rosette, base collar
Delivery time within 20 days
Detailed Images
Detailed Image 1
Ringlock Scaffolding System Includes:

Vertical pipe, Horizontal pipe, Diagonal Brace, Screw Jack, Workboard, Stair System and guard safe parts. It can be used for building protection, formwork support and building face decoration.

Features:
  • Can be quickly erected, just need a hammer to erect, saving labor cost.
  • Convenient transportation and storage.
  • Low maintenance: The hot dip galvanized finish will last its lifetime, with no paint required.
  • No more rust or corrosion, and it can even be stored externally.
Production Process
Production Process
Packaging & Shipping
Packaging Image 1
Packaging Image 2
Packaging Image 3
Manufacturing Facility
Facility Profile
Our Team
Our Team
FAQ
What's your MOQ (minimum order quantity)?
One full 20ft container, mixed orders are acceptable.
What's your packing methods?
Packed in bundle or bulk (customized packaging is accepted).
What's your delivery time?
10-20 days after receiving the advance payment.
Are you a manufacturer or trader?
We are a professional steel product manufacturer with more than 15 years of export experience.
Can you supply other scaffolding materials?
Yes, we can supply all related construction materials.

Related Products